Quote:
Originally Posted by Stunz G.
"production began" 11/16 then it jumps 3 steps to "entering assembly line" on 12/7. Does anyone no how long from this point before I'm driving off the dealer's lot?
|
East coast usually takes a few days for transit, and another day or two for dealership prep/programming.